QuickField.ai
← All posts

How Many Wells Does Your Reservoir Really Need?

How many engineers does it take to change a light bulb?

We don’t know.

But we do know how many wells your drilling plan needs to maximize reservoir performance.

At QuickField, we are constantly improving our algorithms to make reservoir estimation faster and easier — turning workflows that usually take weeks or even months into processes completed in minutes.

One of our upcoming features is an auto-generated drilling plan, built from well production profiles and reservoir volume.

With it, engineers will be able to:

  1. set constraints on the number of wells for one or multiple years,
  2. define a target cumulative oil production by a certain date,
  3. instantly receive a recommended drilling plan.

This update is coming soon.

In the meantime, if you work with oilfield evaluation, reservoir engineering, or drilling planning, we’d love your feedback.

Create an account and try QuickField here:

https://app.quickfield.ai/

#ReservoirEngineering#OilAndGas#DrillingOptimization#PetroleumEngineering#EnergyTech

Auto-generated drilling plan 1
Auto-generated drilling plan 2
Read the associated post on LinkedIn Join the discussion in the comments